Complete M&E solutions

M&E works delivered by KT M&E
M&E general contractor · Tay Ninh

Complete M&E solutions

Full-scope M&E · HVAC · fire protection · water supply & drainage for industrial and civil projects.

About KT M&E

Every project we build follows the approved design documents, uses certified genuine materials, and is handed over with complete acceptance documentation.

120+
Total projects
Delivered residential, factory and infrastructure works
60+
Total staff (2025)
Engineers, supervisors and direct construction crews

Fields of work

Four systems, one contractor

Coordinated design, one construction team, clashes between systems resolved at source — a single general contractor accountable through to acceptance.

01 / 04

Electrical Systems

Full-scope electrical works: power distribution, ELV systems, lighting, lightning protection and earthing for residential and industrial projects.

M&E electrical systems installation
02 / 04

Water Supply & Drainage

Installation of domestic water supply, fire-fighting water, storm-water and wastewater drainage systems for industrial and civil projects.

Water supply and drainage works
03 / 04

Fire Protection (PCCC)

Consulting, installation and acceptance of fire protection systems: addressable alarms, hose reels, sprinklers and smoke extraction — compliant with TCVN and authority-approved.

Fire protection system installation
04 / 04

Air Conditioning (HVAC)

Design and installation of VRV/VRF central air-conditioning, factory ventilation, AHU/FCU systems and fresh-air treatment for offices, hotels and plants.

HVAC air-conditioning installation

Strategic supply partners

Genuine materials

8 electrical, copper pipe, plumbing, steel pipe and HVAC brands KT M&E installs on site — the specified type in the design, with CO/CQ for every delivery.

Partner logo Daikin
Partner logo Mitsubishi Electric
Partner logo Schneider Electric
Partner logo Panasonic
Partner logo LS Electric
Partner logo Toshiba
Partner logo Cadivi
Partner logo Sino
KT M&E construction crew on site
M&E works on site

Quality commitment

Right documents, full certificates

KT M&E builds strictly to approved design documents — no unapproved material substitutions, no scope reductions; every adjustment is documented with the investor's sign-off.

Resident supervising engineers stay on site, inspect each stage and report progress periodically so investors always know the real situation.

Genuine materials

Equipment with full origin documents and CO/CQ certificates for every delivery.

Resident supervision

Engineers stay on site with periodic progress reports.

Complete acceptance files

As-built documentation handed over with clear warranty per scope.

KT M&E people

Leadership

The people who sign the contract, stand on site and answer to the investor until energisation and handover.

01

Lê Tứ Trụ

Director
“Every project we hand over comes with complete as-built documentation — that is KT M&E's commitment.”
02

Nguyễn Văn An

Technical Deputy Director
“Building to approved documents is the baseline — quality lives in every detail before acceptance.”
03

Trần Thị Bích

Head of Procurement
“Certified genuine materials with origin documents are the precondition for every delivery to a KT M&E site.”

How we work

Our 4-step process

01

Survey & quotation

We review the design documents, survey the site and send a detailed quotation within 48 working hours.

02

Shop drawings & approval

We produce shop drawings and obtain approval from the investor and the supervising consultant before work starts.

03

Construction & supervision

Work follows the approved drawings; resident engineers test each stage and issue weekly progress reports.

04

Acceptance & handover

Integrated testing and commissioning, full as-built records and operating guides; warranty for every scope.