| Investor | Tập đoàn Xuân Cầu & B.Grimm Power / CP Năng lượng Dầu Tiếng |
|---|---|
| Location | Dau Tieng Lake, Tan Chau & Duong Minh Chau, Tay Ninh |
| Scale | 500 MWp solar farm across 720 ha lake area |
| Scope of work | Auxiliary electrical · Grounding & lightning · Technical room HVAC |
| Region | Tay Ninh |
| Timeline | 2024–2025 |
Dau Tieng Solar Power Complex in Tay Ninh is among the largest renewable energy installations nationwide, feeding 500 MWp into the national grid via the 220kV Dau Tieng Substation.
During 2024–2025, KT M&E delivered auxiliary MEP packages: cable trenching, grounding protection networks, and climate control for technical control rooms.
Installation adhered strictly to high-voltage utility standards and job site safety protocols.